SEPTEMBER |
|
|
|
 |
 |
 |
 |
|
300 feet down the Nancy Hanks mine |
Looking back up at the Nancy Hanks portal |
Mining the Nancy Hanks |
MSHA trainer, Eric Johnson, leading site specific
training |
|
AUGUST |
|
|
|
 |
 |
 |
 |
|
6 yard mucker |
On-site 550kw generator |
Excavator constructing ore pad |
Road header |
 |
 |
 |
 |
|
Air ventilation into Nancy Hanks |
Mucker in Nancy Hanks mine |
Looking out the Nancy Hanks portal |
Mine buggy |
 |
 |
 |
 |
|
Explosives for mine development |
Electrical grounding grid placed for Nancy Hanks mine. |
Construction on mine safety office |
Miner's tag-in office and showers |
 |
 |
 |
 |
|
Powder mag |
Jumbo drill |
Mine fans |
Nighttime Nancy Hanks portal |
 |
 |
 |
 |
|
Shotcrete and rock bolts |
Loading a round for blasting |
Start of construction of the mine safety office. |
|
 |
 |
|
|
|
Spraying shotcrete around the entrance of the portal. |
Spraying shotcrete around the entrance of the
portal. |
|
|
 |
 |
 |
 |
|
JULY |
|
|
|
|
Nancy Hank portal entrance frame in place |
|
Placing the sets for the portal |
Mucker removing blasted rock fragments |
 |
 |
 |
 |
|
|
Markings for blasting |
Up close at the portal |
|
 |
 |
 |
 |
|
Excavator on portal |
|
|
|
|
JUNE |
|
|
|
 |
 |
 |
 |
|
Senior Consultant Aaron Charlton and engineer Johhn
Kotson of CDM at the portal location. |
Members of the Montana DEQ tour the mine
site |
Early stage of setting the portal. |
VP Geology, Bob Flescher discussing plans with the Montana DEQ |
|
SEPTEMBER |
|
|
|
 |
 |
 |
 |
|
Aaron Charlton, Chief Consultant, identifying the new vein at
Lead King |
Gold
ore for the mill |
Ore tailings |
Sampling the new Lead King vein |
 |
 |
 |
|
|
Gold
ore for the mill |
Dr. Sears analyzing the new vein |
Jeff Switzer measuring the new vein |
|
|
AUGUST |
|
|
|
 |
 |
 |
 |
|
Lead King ore stockpile |
Stockpile |
Screened ore pile |
Screening plant |
 |
 |
 |
 |
|
Loading up the haul truck with gold ore for the mill |
Loading up the haul truck with gold ore for the mill |
Equipment operators |
Lead King Mine |
 |
 |
 |
 |
|
Screening plant |
|
Loader and excavator |
|
 |
 |
 |
|
|
Haul truck |
Haul truck to staging area |
Lead king ore tailings |
|
 |
 |
 |
 |
| Installing a culvert on the county road damaged
erosion |
Road improvements |
Reclamation work |
|
 |
|
|
|
| |
|
|
|
| |
|
|
|